sharing common design, engineering, manufacturing, personnel and facilities, with the advantage of transferring technology between the different fields within liquid, gas and liquefied gas equipment.
As a result of research and development of new technologies, Tecno Project Industriale spread in the international market installing plants and equipment operating all around the world.
In 1991, TPI moved to a new facility provided with a large workshop to follow better the construction.
In 1996, TPI purchased an second separate workshop with offices (located in via Carlinga, Curno) to tests CO2 and N2 units in operation conditions and check one of the most important part of the plant, the refrigeration section.
In 2003, TPI added a new building to develop plant controls and analysis, as well as extension of the existing main offices, to follow the necessity of the quality control and of the increasing necessity of quality in CO2 field.
At present, the production process is split in 3 different workshops: one for CO2 Division mechanical works (construction, welding and assembly), one for GAS Division mechanical works and a third one for tubing, cabling, wiring, electrical test, quality inspection and packaging.
The structure is completed by a Store Room for construction materials and spare parts.
|