AIR & GAS PURIFICATION - DRYING


DRYING UNIT "HEAT-LESS" SERIES CD

Operation :

Compressed air passing through one of the two towers is dried by the adsorbent material (adsorption process - Van Der Waals theory)
Simultaneously, the other tower is regenerated by purging a small volume of the treated air from the outlet of the first tower.
The two towers automatically alternate operation every 3 to 5 minutes.

Where to use :

  • For all uses requiring compressed air with a forced drying grade (D.P. -40 °C - 70 °C).
  • The recommended flow rates go from 5 to 1.000 mVh (80 L/min -16.000 L/min).

  • Simple to operate with low investment costs.

  • Units are available for larger capacities, however, for high air flows the cost of the compressed air used for the regeneration is not economical (even if adjustable from 7% to 15% with the possibility to save costs using hygrometric or flow devices).

Control and safety devices :

  • Dried air control indicator.

  • Compressor linkage device.

  • Electronic control of the purge consumption (7% -15%).

  • Cycle safety and control systems.

  • Dew point analyzer with purge consumption reducer.

  • Completely pneumatic versions for dangerous areas or remote installations.




"HEAT" REGENERATED DRYING UNIT SERIES BD

Operation :

Compressed air passing through one of the two towers is dried by the adsorbent material (adsorption process - Van Der Waals theory). Simultaneously the other tower is regenerated by blowing pre-heated air through the adsorbent "bed". The two towers alternate operation every 4-6 or 8 hours.

Where to use :

  • Suitable for medium to large flow capacities where forced or absolute dew points are required (-40 °C/70 °C/-100 °C).
  • The recommended flow rates start from 400 m3/h.
  • Minimal consumption of purge air. Operation costs are considerably less than the "HEAT-LESS" system.
  • Units are available for all requirements.
  • Steam and electrical regeneration.
  • Regeneration with partial vacuum available.
  • Closed circuit regeneration (zero purge).
  • Regeneration with ejector, without blower (without electric energy with an independent heat source supplied by the client).

Control and safety devices :




  • Synoptic control panel.

  • Dried air control indicator.

  • Control systems for energy saving.

  • Control systems of the various phases.
  • Dew point analyzer with cycle control (Eco-Tecno).
  • Centralized control systems (with RS 232).



CO2 PRODUCTS



• CO2 PRODUCTION PLANTS

• CO2 RECOVERY PLANTS

• CO2 - N20
CRYOGENIC TANK


• AIR HEATED CO2 VAPORIZERS

• ZIRCONIA OXYGEN ANALYZER

• CYLINDER FILLING STATION


• CO2 GASCROMATOGRAPHIC ANALYSIS SYSTEM

GAS DIVISION


• AIR & GAS PURIFICATION-DRYING

• NITROGEN PRODUCTION UNITS

• NATURAL GAS DEMISTERS & DRYERS (CNG)

• SEAL GAS RECOVERY UNITS

• SPECIAL REFRIGERATION UNITS
















Tecno Project Industriale s.r.l. - 24035 Curno (BG) - Italy - via Enrico Fermi, 40
tel. +39 035 4551811 - fax +39 035 4551895 - e-mail: tpi@tecnoproject.com
P.Iva 01070500168